No recent failure events
No machine faults were recorded in the last 7 days.

PLC faults and operator feedback flow into the same timeline as ERP work orders. Every downtime event links to the work centre and production order it interrupted — prioritize by operational cost, not just recency.
No machine faults were recorded in the last 7 days.
Tap any dot for machine detailsWhich assets currently combine weak live availability with real fault, downtime, or output evidence?